The Tote< back Tote_Fin_10

The tree structure was designed to be a steel truss and the challenge lay in working through the construction system compatible with local skills. Rather than looking at steel fabricators within the building construction sector, we sourced boiler fabricators for high precision work. We explored two sectional profiles for the truss, a box section and an I-section.

 

 

 

 

 

 

 

 

 

 

 

 

 

Photo(right): Edmund Sumner

Photo (left): Fram Petit

1 2 3 4 5 6 7 8 9 10 11 12 13
  Project Write Discover News About Contact
www.serie.co.uk